Double-decker carousel for a travelling park
A Mobile park owner in Czech Republic needed a Mobile park scope of Mobile park flagship, delivered by DINIS.

Project overview
What this project had to resolve
Overseas buyers judge a supplier by whether the scope can reach the site, be installed and open on time.
Buyer priorities
- A complete, export-ready scope matched to the Mobile park format, not a loose list of single rides.
- Configuration, documentation and packaging that fit the destination market and site.
- A delivery plan aligned to the opening window, with transport and installation accounted for.
Typical constraints
- Site area and access limit footprint and how equipment is split for transport.
- Local power, foundation and lifting conditions affect configuration.
- Custom decoration and certification can extend lead time, so they are confirmed early.
How the scope was decided
The configuration followed the operating goal, not a one-size-fits-all package.
What was delivered
Double-decker carousel.
Why this combination
Each item was selected to balance throughput, footprint and delivery risk. Standard configurations were kept where possible for cost and lead time; site-specific or branded elements were limited to what actually changed the operating result.
How delivery was run
Execution is a sequence of checks, not a promise made after the order.
1. Requirement confirmation
Country, venue, area, visitor profile and opening plan are confirmed before any drawing is fixed.
2. Configuration & documentation
Models, finishes, power and the documentation set are locked to the destination market.
3. Production & pre-assembly
Critical welds and surfaces are inspected; larger units are pre-assembled and test-run before packing.
4. Packaging & shipment
Parts are marked, protected and loaded against the shipping list so site receiving and lifting stay predictable.
5. Delivery & installation support
Installation guidance, manuals and follow-up keep the opening schedule under control.
What changed after delivery
Results are stated as project facts, not as a sales claim.
- Trailer-friendly operation
- Order value: USD 100,150
Buyer takeaway
What this delivery tells a buyer planning the same format.
- A Mobile park in Czech Republic was delivered as a scoped DINIS project with documented ride lists and scale.
- Buyers who visit the factory or request documentation early convert with less rework — the project notes record this pattern.
- Similar projects start with the same brief: country, venue, area, audience, budget and opening plan.
Questions buyers ask before starting
Can a project like this be delivered on my site?
Scope depends on area, visitor profile, power and access. Send those inputs and we confirm feasibility against the same checklist used for this project.
What should I confirm before asking for a quote?
Country, venue type, site area, target visitors, opening window, power supply and any branding or certification needs.
How do you keep the delivery window predictable?
We fix configuration early, keep standard items standard, and confirm packaging and container loading against the shipping list before dispatch.
Do you support installation?
Yes. Installation guidance, manuals and follow-up are included, with on-site support arranged where the project requires it.