Engineering & Quality
Engineering evidence for DINIS ride projects — manufacturing, inspection and quality controls.
Manufacturing process
Design & engineering review
Configuration confirmed against the project brief; drawings, documentation scope and standards agreed before production.
Steel fabrication & welding
Heavy-duty and high-strength steel; critical surfaces inspected with magnetic particle (MT) and penetrant (PT) testing.
Surface treatment
5-6 layer anti-corrosion paint system with published 5-year color retention practice.
Sub-assembly & pre-assembly
Structural sections aligned in the factory; large rides pre-assembled before shipment.
Factory testing
Published examples: 90-hour factory testing for Top Spin; at least two logged test runs for swing rides.
Packing & shipment
Container packing with transport documentation; inspection documentation part of deliverables.
Standards & certification
- Special Equipment Manufacturing License (Class A)
- ISO 9001 quality management system
- CE certification (company-level statement)
- GB/T 19001-2016 quality management system
- Occupational health and safety management system
- Environmental management system
- High-tech enterprise
- 20+ utility model patents
- "China Amusement Industry Famous Brand" honor
Certificate numbers, issuing bodies and product-level coverage are confirmed in project documentation.
Weld inspection
Magnetic particle (MT) and penetrant (PT) testing on critical surfaces and weld areas; key safety components 100% inspected.
Coating process
5-6 layer anti-corrosion paint system with published 5-year color retention practice; FRP shells hand-laminated in dust-free workshops.
After-sales
7×24 service hotline, 2-hour solution response, on-site within 24h (province) / 48h (country) / 72h (remote) for domestic China; long-term spare parts availability 5-10 years after delivery; remote diagnostics; installation guidance in text, pictures and video.